Stabilize
Coordinate cleaning, drainage and securing of movable components where required.
03 / EXPORT PREPARATION
Coordinate cleaning, fluid removal, protective wrapping, blocking, bracing and loading requirements around the actual machine and transport method.
PREPARATION SCOPE
Preparation requirements are confirmed for each project and transport method rather than assumed from machine category alone.
Coordinate cleaning, drainage and securing of movable components where required.
Plan wrapping, corrosion protection, accessory packing and exposed-surface care.
Align blocking, bracing and loading with carrier and equipment requirements.
PREPARING A MACHINE FOR EXPORT?